HEALTH AND SAFETY (2010)

A 2 month installation and performance in my studio flat, London.

On 1 March 2010 I risk assessed my flat to industry standards, implemented the necessary physical and procedural control measures in order to make it "safe" and then continued to live in the space. A further risk assessment was carried out on 1 May 2010 so that visitors (i.e. people unfamiliar with the risks on site) could safely enter the premises. From 15 May my flat opened to the public, by appointment, as a showcase for domestic health and safety.

Images - pre - risk assessment:

safe2

 

Images - post risk assessment:

 

The full project report can be downloaded here:

 

<< back to portfolio